Everything you need to know about ADU zoning, municipal permits, construction timelines, costs, and licensing in Los Angeles & San Diego.

The total timeline typically ranges from 4 to 8 months. This includes drafting the design plans, securing city permits (which takes 2 to 3 months), and the physical construction (3 to 5 months depending on the size of the project). We streamline every phase to avoid delays.